Engineeringfullstop is undertaking a full seismic upgrade to 13 story 50 manners st wellington known as the ‘I center’.

This upgrade includes the strengthening of the stair well which we have completed and the a full steel seating around the perimeter of the building and down the center beams bringing this project to 100% NBS. There will be around 1600 holes drilled and studs installed by the time the project is finished.